WoF press

Working on Fire

Press Release

1 September 2008

published by Working on Fire Programme 


South Africa — Veld fire situational report as at 21h00 1/9/08   UPDATES IN CAPITALS

NB.  This reflects only the incidents that are known to Working on Fire and is not a complete overview of the country sitrep.

 

Injuries : Mpumalanga 23 burn wounds, mostly civilians, no WOF personnel.

Deaths ; Mpumalanga 3  civilians

Deaths : KZN 8 .- 7 civilians and 1 non – WoF bomber pilot.   MEDIA REPORTS HIGHER BUT WOF CANNOT CONFIRM

 

Mpumalanga: 14 new fires today.  9 ARE ONGOING AS AT 19H00

KZN : 3 new fires today  ESHOWE?, VRYHEID X 2.  DARGLE STOOD UP BUT NOW CONTAINED. MELMOTH ONGOING

LIMPOPO:  2 FIRES, TZANEEN 2 X SANDF ORYX ASSISTING WITH EVACUATIONS AT LIBOII[ SP] , HAENESBERG, ON RANDFONTIEN RD IN DIFFICULT TERRAIN, FIRE UNATTENDED. [ DECISION TO LEAVE]

EC : LANGENI CONTAINED.  NEW FIRE KARREEDOUW IN FYNBOS, W CONDITION ORANGE, ONE CREW DEPLOYED.

SWAZILAND 2 FIRES OUT OF CONTROL.

 

Weather forecast : From Bloemfontein across to KZN/ Eastern Cape  and northwards, the forecast is for Yellow/ Orange from tomorrow through to Saturday across the entire region. By Saturday Danger Index will move back up to Orange /Red. Currently, due to strong winds, some aerial operations are suspended.  Caution should be taken when driving – bad visibility, debris on the roads, strong winds.

 

AIRCRAFT STILL GROUNDED IN SOME AREAS DUE TO POOR VISIBILITY, WIND.

 

Total fires since the start of the weekend and estimated damages.  

41 KZN – 10,000 HA damaged NO UPDATE YET

49 Mpumalanga – 22,000 HA burnt of which 13,000HA is forestry NO UPDATE YET

 

11 Free State – 33,315 HA mostly grazing.  Undetermined number of stock. INCREASED ESTIMATE

5 Gauteng  – ? HA damaged.

2 EC  – [ Langeni – 3 days and ongoing in Timber 2000HA lost] NO UPDATE YET

1 NW – SAPS training centre at Thabazimbi. FIRE CONTAINED, CREW DEPLOYED TO MOP UP.

16 Limpopo  – 1000HA lost NO UPDATE ON DAMAGES

 

Sawmills damaged/ destroyed.

2 MPU – Piet Retief sawmill plus 10,000tons stacked timber,

Nelspruit Sawmill.

1 Limpopo – Tzaneen.

Threatened  – 4 sawmills at Louis Trichardt – unconfirmed damage.

 

Damages KZN [ Unconfirmed] 30-40 rural settlement homes near Dargle, Racehorses/ Stables,

I house at Drakensberg Sun Hotel.

Livestock – unestimated at this stage.

 

Working on Fire Firefighting Crews deployed at firelines: CREWS ROTATING SHIFTS.

13 crews Mpumalanga

3 crews Limpopo

4 crews Gauteng

13 crews KZN

3 crews EC.

Val Charlton
Advocacy Manager
Working on Fire


Print Friendly, PDF & Email
WP-Backgrounds Lite by InoPlugs Web Design and Juwelier Schönmann 1010 Wien